Driveway Paving in Baton Rouge, LA

New asphalt driveways for Baton Rouge homes in Southdowns, Shenandoah, Westminster and Bocage: the old surface out, a compacted stone base in, and hot-mix rolled smooth with clean edges at the street and the garage. Call (225) 338-4482 to set up a walk-through.

New asphalt driveway being rolled in front of a brick home in Baton Rouge, LA

How a new asphalt driveway goes in

  1. Measure and mark. We measure the area, mark the edges, and note where water stands after a storm and where it should go instead.
  2. Take out the old surface. Broken asphalt, cracked concrete, shell or gravel comes out and is hauled away, down to firm ground.
  3. Grade for fall. The subgrade is shaped so the finished driveway sheds water away from the slab and toward the street or a drain, never back at the house.
  4. Build the base. Crushed stone goes down in layers, each one compacted, until it is firm enough that a loaded truck barely marks it.
  5. Lay the asphalt. Hot-mix is spread to an even depth and rolled while it is hot, usually two to three inches thick after compaction for a home driveway.
  6. Finish the edges. The apron is tied into the street, the top edge is feathered or butted cleanly to the garage slab, and the sides are tamped so they do not crumble.

Driveway installation on flat lots and clay ground

Most Baton Rouge lots have very little natural slope, so a driveway has to be built with its own. A few inches of fall over the length of the drive is the difference between rain running off in minutes and a puddle that sits by the garage door all afternoon and slowly soaks the base. On clay ground we often dig deeper and put down more stone, because clay moves with the seasons and a thin base moves with it. Where the drive crosses an open roadside ditch, we look at the culvert under the apron too; a crushed or undersized pipe backs water up under new asphalt.

Live oaks are the other local problem. A big oak near the drive can lift and crack pavement within a few years. We will tell you on the walk-through if roots are in the path, and what the options are, from routing the edge around them to cutting and bridging.

Call (225) 338-4482 Request a callback

A blacktop driveway or another surface

Asphalt is not the only choice, and for some homes it is not the best one. Concrete costs more up front and handles oil and heavy point loads better; asphalt is quicker to install, easier to repair and easier to resurface later. A long rural drive may be better served by tar and chip or a compacted millings base. The concrete vs asphalt guide, the tar and chip page and the millings page lay out the trade-offs honestly.

Driveway contractors in Baton Rouge: what a written price should show

Before you compare quotes, make sure each one names the same things: the square footage, how much old material comes out and where it goes, the depth of new stone base, the compacted thickness of the asphalt, how the apron meets the street, and how water will leave the drive. Ours lists each of those as its own line. The asphalt driveway cost guide explains what moves each number.

Residential paving outside the city

Besides Baton Rouge we pave new driveways in Denham Springs, Prairieville, Gonzales, Zachary and Central, where newer subdivisions and longer rural drives make up much of the work. A long country drive is priced the same way as a city one, by area, base and thickness, with drainage looked at first.

Questions about new asphalt driveways in Baton Rouge

How long does an asphalt driveway last in Baton Rouge?

Built on a firm, well-drained base, an asphalt driveway commonly lasts 15 to 20 years here. Sealing hairline cracks as they appear and sealcoating every few years keeps water and sun from aging the surface early. The driveways that fail young usually sit on a thin base over wet clay or hold standing water, which is why we start every price with drainage and base.

Call (225) 338-4482 or request a callback.

When can I drive on a new asphalt driveway?

Plan on walking on it after the first day and driving on it after about three days, longer in July and August when the surface stays soft in the afternoon heat. For the first few weeks, avoid turning the steering wheel while the car is parked, keep jacks and kickstands off it, and keep heavy trucks off the edges. We will give you the timing for your driveway when we finish.

Call (225) 338-4482 or request a callback.

Planning a new driveway: what helps when you call

These details let us plan the walk-through and price the tear-out, base and asphalt accurately.

Call (225) 338-4482 Request a callback

Request a callback

Leave your details and we will call you back to set up a walk-through and a written price.

Rather talk it through? Call (225) 338-4482.